Robert Service School Stair Upgrades

Robert Service School Stair Upgrades

Robert Service School Stair Upgrades

Client: Yukon Government – Highways & Public Works

General Contractor: Grey Customs Inc.

Project Scope

  • Scape down structural steel to bare steel
  • Remove select piles
  • Install gravel beds, footings and cribbing
  • Re-paint all structural steel metal

Minto Park Concession Building

Minto Park Concession Building

 Minto Park Concession Building

Client: City of Dawson

General Contractor: NGC Builders Ltd.

Grey Customs Inc. – Sub-Contractor 

  • Site Supervisor
  • Carpentry
  • General Labour

Decks, Fences, Handrails and Stairs

Decks, Fences, Handrails and Stairs

Handrail & Stairs

We use them every day.
Handrails are there to support you when you need them the most.
Stairs comfortably get us the the next level.
Grey Customs Inc. can take between 1 hour to 1 week+ from design to finish of your handrail and/or staircase.

Wood & Steel combinations are encouraged. If you can imagine it, we will make it! click here

The sky is the limit when it comes to handrail options. And we can make you the stairs to get you there.

Billy Goat’s Pub – Deck

Client: Local Business – Billy Goat’s Pub

The Billy Goat’s Pub was expanding into the back ally Spring-2015. With all the contractors in Dawson being swamped with work, Grey Customs Inc. delayed the Sawmill Building: Insulation Upgrade project for a week to give owner Tony Dovas a helping hand. Within weeks the town of Dawson was able to enjoy “La Casa De Beba”

Window Upgrade

Window Upgrade

Window Upgrade

Client: Bridgette & Hank

Window Supplier: Northerm Windows & Doors

  • Triple Pane 3800 Series
  • Optional Low-emissivity (low-e) glass
  • Triple Argon Gas

For information about Northerm Windows and Doors click here

  • Removed and disposed of 9 windows
  • Repaired any structural damage
  • Install 9 new windows
  • Spray-foam insulation
  • Installed drip-caps where necessary
  • Exterior cladding & caulking
  • Interior casing (trimwork)

Dawson City Swimming Pool Upgrades

Dawson City Swimming Pool Upgrades

Dawson City Swimming Pool – Upgrades

Client: City of Dawson

General Contractor: Budget Plumbing & Heating

Grey Customs Inc. – Structural & Architectural 

  • Chimney Curb
  • Fuel Tank Fence
  • Exterior access to mechanical room
  • Concrete slabs in crawlspace
  • Stairs to crawlspace
  • Fire separations in crawlspace
  • Storage Room

Storefront

Storefront

Storefront

Client: Aurora Office

Design & Built by Grey Customs Inc.

Client Specifications:

  1. Shorten the depth of the Deck
  2. New Flower Boxes
  3. Long Lasting

This storefront was in need of a deck replacement. We did just that. From the foundation up, all new materials were used. The railing system meets all the Dawson City historic by-laws and all materials are PWF, ACQ or Primed to ensure a long-lasting storefront.

Prior to the new Deck and Flower-boxes, the stairs landed on the boardwalk. Thus leaving the levelling of the boardwalk up to the property owner. Now, the new stairs no longer rest on the boardwalk making the levelling the City of Dawson’s responsibility.

Maintenance

Maintenance

Maintenance

No matter how large or small your project is, get in touch with Grey Customs Inc. We will ensure your maintenance project is dealt with correctly. Every project has more than 1 way to be approached, the more cost affordable & long-lasting route is what Grey Customs Inc. strives for.

YHC – 351 Turner St.

YHC – 351 Turner St.

YHC – Crawlspace Insulation and Drywall Installation

Client: Yukon Housing Corporation – 351 Turner St. Dawson City, Yukon.

Yukon Housing Corporation has some great resources, check them out! click here

5500 sq. ft. of Roxul

7500 sq. ft. of Drywall

6500 ft. of Fire Tape

-Insulate 2×6 fire partition walls with R-22 Roxul ComfortBatt.
-Drywall 2×6 fire partition walls with 5/8″ Type X – Mould and Moisture Resistant Drywall
-Fire tape joints.

Yukon Saw Mill Co. – Historic Site

Yukon Saw Mill Co. – Historic Site

Yukon Sawmill Building – Insulation Upgrade

Client: Yukon Government – Historic Sites – Tourism & Culture

For information about this structure visit Canada’s Historic Places website. click here

All work was to comply with the “Standards and Guidelines for the Conservation of Historic Places in Canada”

Material Preservation: Interior cladding was removed and stored on site for later use.

-Removal of any existing insulation.
-Sprayed 2″ of 2.0 lbs. closed-cell foam to the underside of the addition floor.
-Insulated the floor with R-40 fiberglass batts, 2″ expanded polystyrene, taped weather-barrier and 3/8″ plywood soffit.
-Insulated exterior walls with R-20 fiberglass batts, sheathed walls with 1/2″ plywood then 1″ polyiso foil-faced foam w/ taped seams.
-Installed a vapour barrier on the interior subfloor, caulked and taped vapour barrier to the foil-faced sheathing then installed 1/2″ subfloor.
-Framed 2×4 walls on both floors
-Insulated ceiling with R-60 fiberglass batts, insulation baffles, vapour barrier, strapping and attic hatches.
-Installed a 2-1/2″ soffit around the roof-line perimeter.

Grey Customs Inc.

+1 867•993•3668
[email protected]
Box 631, Dawson City
Yukon Territory, Y0B1G0
Canada

Grey Customs

+1 345•923•6809 WhatsApp#
[email protected]
P.O. Box XXX, 10 Market Street, Camana Bay
Grand Cayman, KY1 9006
Cayman Islands

Grey Customs Inc.
Grey Customs Inc.
Grey Customs Inc.
Grey Customs Inc.
Grey Customs Inc.